Home >> Competence >> basic facilities
 

Investment RMB 200 Billion for the Building berth and pier; A newly increased coast line which is 400m long with a pier length 185 and width 18m equipped with a 25 high crane; One set of 155 x 85m half-dock type slopped dock completed with two sets of 160T gantry crane with 72m span; An 250 x 55m outside block assembling workshop fitted with 6 sets of 5T door crane and on set of 50T x 2 + 75T/10T door crane; Together with Distribution workshop which is 1800 square meter; 5750kw transformer station and other facilities accordingly; Pre-fabrication Line of the Steel Plate. Imported Equipments’ stockyard directly managed by the Custom. Stockyard covers 5,000 square meter’ Building Capacity per year can reach 100,000T.

 

20,000T Dry Dock
Outfitting Pier
office building
culture wall
steel plate stockyard
the third indoor slipway
slipway transverse shift area
Middle assemble area
5750KW transformer substation
page1 pages:2 9 7 8 :
COPYRIGHT(c) 2008 TONGFANG JIANGXIN SHIPBUILDING CO,.LTD. All Rights Reserved